Markham, ON

Mon - Sun: 8AM - 8PM

Follow Us On Instagram!

Who We Are

Para-Loc Inc. is a professional interlocking and landscape construction company serving residential and commercial clients across Markham, Toronto, and the GTA. Founded in 2018, we specialize in interlocking stonework, concrete installations, fencing, decking, and complete outdoor hardscape design and build services.

As a family-owned business led by father-and-son team Sam and Donny Shen, we combine hands-on expertise, quality craftsmanship, and reliable project management to create durable, functional, and visually striking outdoor spaces. From driveways and walkways to large-scale commercial projects, our goal is to deliver professional results with precision, efficiency, and long-lasting value.

What Sets Us Apart

What sets Para-Loc apart is our hands-on approach, strong project management, and commitment to delivering durable, high-quality outdoor construction.

• Family-owned business built on trust, reliability, and craftsmanship
• Experienced interlocking and landscape construction professionals
• Specializing in interlocking stonework, concrete, fencing, decking, and hardscape projects
• Efficient scheduling and organized project coordination
• Focus on proper base preparation, durability, and long-term performance
• Clear communication and personalized service from start to finish

We don’t just build outdoor features... we create functional, long-lasting outdoor spaces designed to enhance your property’s value and appearance.

QUESTION ABOUT INTERLOCKING PROJECTS?

Not sure which interlocking design, materials, or layout will work best for your property? We provide expert guidance on planning, preparation, and project requirements to help you make the right decision from the start.

Donny Shen

Co-Founder & Project Lead

Born and raised in the community he proudly serves, Donny has dedicated his career to landscaping and interlocking from day one. With a genuine passion for outdoor construction, he brings hands-on experience, creativity, and attention to detail to every project. Donny loves what he does, and it shows through his commitment to quality craftsmanship and client satisfaction. From initial consultation through final installation, he works closely with clients to turn ideas into functional and visually striking outdoor spaces built to last.

Sam Shen

Co-Founder & Operations Lead

Sam immigrated to Canada in 1998 and has spent his life working hard to build opportunities for his family and community. With a strong work ethic and dedication to excellence, he plays a key role in ensuring every project is completed with care, precision, and integrity. As a father of three, Sam’s commitment to doing his best extends beyond the job site. It’s reflected in the values that guide Para-Loc today: reliability, honesty, and pride in delivering quality work that stands the test of time.

Commonly Asked Interlocking & Landscape Construction Questions

Have questions about interlocking, concrete, fencing, or decking projects? Here are answers to some of the most common questions we receive.

Do you offer both residential and commercial services?

Yes. We complete projects for homeowners, businesses, and commercial properties, ranging from small residential installations to large-scale outdoor construction.

How long does an interlocking project usually take?

Project timelines vary depending on size, design complexity, and weather conditions, but most residential interlocking projects are completed within a day to a week.

Is interlocking better than poured concrete?

Interlocking offers flexibility, durability, and easier repairs compared to traditional poured concrete. It also provides more design options in terms of colors and patterns.

Do you handle excavation and base preparation?

Yes. Proper excavation and base preparation are critical for long-lasting results, and our team ensures every project is built on a strong foundation.

Do you offer design assistance or layout planning?

Absolutely. We work with you to create layouts, select materials, and develop designs that match your vision and property.

How much does an interlocking or landscaping project cost?

Pricing depends on project size, materials, site conditions, and design details. We provide detailed estimates after an on-site consultation.

When is the best time of year to start an interlocking project?

Spring through fall is ideal for outdoor construction, but booking early helps secure preferred scheduling.

Para-Loc Inc. offers exceptional interlocking pavers installation and landscape design services in Markham, Durham Region, Toronto and neighbouring cities. Our team of experienced and qualified contractors is dedicated to providing top-notch workmanship and customer satisfaction

Follow Us:

Copyright © Para-Loc All Rights Reserved. Powered by Sqale Systems Inc.